Skip to the content
Steel · Ladle and secondary steelmaking · AREL®

Ladle and Secondary Steelmaking

Complete solutions, from the safety lining to the nozzles, and refractories for the degasser.

Precast and monolithic parts for the ladle, degasser and AOD, designed and made in Dudley.

Complete solutions
  • Safety and working linings
  • Working and safety bottoms, single or multi-part
  • Pro rings and top ring blocks
  • Well blocks, plug blocks and nozzles
  • Ladle lids
  • Degassers
  • AOD hoods and safety bottoms

Using 3D design, rapid prototyping and a deep understanding of refractory behaviour, we create optimised shapes such as top rings and support blocks that streamline installation and reduce heat loss.

In service

What we make.

Well block Precast ladle well block, set in the bottom to seat the nozzle.
Working and safety bottoms Working and safety bottoms for the ladle, cast as a single piece or in several parts to fit.
Pro rings Ladle pro-ring in 1800TAL.
Top ring blocks Engineered top ring blocks.
Plug blocks and nozzles Plug blocks, and upper and lower nozzles in LC185N.
Ladle lids Fully manufactured in Dudley, up to 5 metres and 8 tonnes: we fabricate the steelwork, cast the refractory and assemble the lid on one site.
Degasser Degasser refractories, in materials to suit the environment.
AOD hoods Precast refractory linings for the AOD hood.
AOD safety bottoms Dished safety bottoms for the AOD vessel, precast in sections.
Ladle

Ladle lids

We fully manufacture ladle lids in Dudley: we design them, fabricate the steelwork in our own Fabrications Department, cast the refractory and reline them when they come back. The refractory is cast as a dense, needle-reinforced perimeter with inner and centre segments, all rebated so that hot gas cannot pass to the steelwork, over an insulating backing layer.

What a lid is worth

An open ladle top radiates 60,000 to 80,000 W/m² from the slag surface. Our calculation for an insulated lid gives about 7,000 W/m², a reduction of roughly 88% to 91%. The table gives the estimated steel temperature kept over 30 minutes, against an open ladle.

A lid put on cold takes heat from the steel for the first 15 to 25 minutes, so a preheated lid does the most good.

100 tonne ladle
8 to 11 °C
150 tonne ladle
7 to 9.5 °C
250 tonne ladle
6 to 8 °C

Talk to our steel team.

Tell us about your process and the problem you want solved, and our technical team will help you choose.